mill producing caf algeria
Along with the meltshop, the producer is planning to build a 2.5 million-tpy DRI plant, 750,000-tonne rebar mill and 500,000-tonne wire rod mill. Currently AQS operates a 750,000 tonnes rebar mill, installed in October 2017. Additionally, steel production is expected to restarted at the Annaba-based El Hadjar Steel Complex by 2020.
اقرأ المزيد![](/image/whatsappp.png)